HomeArticles
Enter the file name, and select the appropriate operating system to find the files you need:

microsoft.office.interop.msproject.dll File Information

FileName
microsoft.office.interop.msproject.dll
Comments
-
InternalName
Project Primary Interop Assembly
Microsoft Project Primary Interop Assembly
ProductName
Microsoft Office 2010
2007 Microsoft Office system
Microsoft Office 2013
Microsoft(R) Project for Windows(TM) Primary Interop Assembly
CompanyName
Microsoft Corporation
LegalCopyright
? 2010 Microsoft Corporation. All rights reserved.
? 2006 Microsoft Corporation. All rights reserved.
Copyright? Microsoft Corporation 1990-2003.
ProductVersion
14.0.4733.1000
12.0.4518.1014
15.0.4569.1507
11.0.0.0
15.0.4569.1502
14.0.4751.1000
14.0.7006.1000
FileDescription
Microsoft.Office.Interop.Project
Microsoft Project Primary Interop Assembly
LegalTrademarks
Microsoft(R) is a registered trademark and Windows is a trademark of Microsoft Corporation.
PrivateBuild
-
OriginalFilename
Project Primary Interop Assembly
Microsoft Project Primary Interop Assembly
SpecialBuild
-

 

This file can be used in the following paths:
  • • c:\program files\microsoft visual studio 10.0\visual studio tools for office\pia\office14\
  • • c:\smartdraw 2010\
  • • c:\windows\infusedapps\packages\microsoft.office.desktop_16000.8528.2136.0_x86__8wekyb3d8bbwe\vfs\windows\assembly\gac_msil\microsoft.office.interop.msproject\15.0.0.0__71e9bce111e9429c\
  • • c:\program files\microsoft visual studio 9.0\visual studio tools for office\pia\office11\
  • • c:\windows\assembly\gac_msil\microsoft.office.interop.msproject\15.0.0.0__71e9bce111e9429c\
  • • c:\windows\assembly\gac_msil\microsoft.office.interop.msproject\14.0.0.0__71e9bce111e9429c\
  • The above paths are the common paths where this file is located, but does not mean that it must be stored in the above paths. The file should be stored in the actual installation path of the software.
    Tip: If you cannot find the software installation path, you can follow the path suggested above, find one by one, and put the file inside the path found.
Tip: How to correctly select the file you need
  • 1.  If you know MD5 value of the required files, it is the best approach to make choice
  • 2.  If your original file is just corrupted but not lost, then please check the version number of your files. (Method: Click your original file, and then click on the right key to select "Properties" from the pop-up menu, you can see the version number of the files)
  • 3.  If your operating system is 32-bit, you must download 32-bit files, because 64-bit programs are unable to run in the 32-bit operating system.
  • 4.  There is a special case that, the operating system is a 64-bit system, but you are not sure whether the program is 32-bit or 64-bit. If you encounter this situation, check the file path to see whether there are any other files located in. If yes, please check the properties of these files, and you will know if the file you need is 32-bit or 64-bit.
  • If you still can't find the file you need, you can leave a "message" on the webpage.
  • Download microsoft.office.interop.msproject.dll file:
  • File Version File Md5 File Bit File Size Download
  • 14.0.4733.1000 481ed3851d531dbf630031d9eabecb2132 bit953 KDownload this files
  • 12.0.4518.1014 f3ca29eb39fb7f33fcc9dac334405c2532 bit882 KDownload this files
  • 15.0.4569.1507 83794eb9a6a78d6db41b6a77811159c932 bit1002 KDownload this files
  • 11.0.2003.0816.15 7da6ff3b49989bcdcaeaa4eb80f8b4a232 bit762 KDownload this files
  • 15.0.4569.1502 9d18a5c187773b6762b2d25e11f5bb1d32 bit1002 KDownload this files
  • 14.0.4751.1000 997c7ba8817afbb0b9831e03b0a0e0c032 bit953 KDownload this files
  • 14.0.7006.1000 9410598621b5d81c659e81b44c2e359f32 bit954 KDownload this files
  • If you also need to download other files, you can enter the file name in the input box.

    1 Enter the file name
    2 Click download link and go to the download page of the file.

    Enter the file name:

    Next, please confirm file verion, and select the proper download link.
    click "Download" to enter its download page.

    Check here go to the Search input box.

    File Finder:

    • Can't find the version of the file you need?
    • The downloaded file cannot be used due to unstable network?
    You can try to use this file finder. The method is very simple. Enter the file name, and you will find many versions of this file. Select the file version you need to download, this tool will automatically download a complete file for you. Click Here Download File Finder

    If you have any further questions or need help, please leave us a message:
    Leave a Reply

    Your email address will not be published. Required fields are marked *

    Please select the message type:
    It's a common message
     (when you choose this option, please fill in your Email correctly, and we will reply to you as soon as possible.)

    Name *

    Email

    Comment

    User Reply & Help
    [2024-10-17]
    monir say: My machine is 64 bit and there is no file for 64 bit windows 10. I try to install scanner software b ......
    Reply: If you want to register this DLL file with the system, you can use the registration command, just li …view >>>
    [2024-08-26]
    Tarrant say: Hey, can you upload PGPwded.sys v10.4.1 or earlier?
    Reply: Currently, I have not found the file for this version. If I find it, I will upload it as soon as pos …view >>>
    [2024-08-06]
    Sunil say: this driver is not working for windows11
    Reply: You can try using version 2.3.0.0 of this file. This version is 64-bit, and since Windows 11 is also …view >>>
    [2024-07-31]
    manisha say: I have programme of Arpita text Entry 2000 software which is Bhasha Bharti Gujarati data entry softw ......
    Reply: This is a compatibility issue, which means the program may not run well on Windows 11. You can try t …view >>>
    [2024-07-28]
    Curtis Reeves say: I lost madExcept_.bbpl on my Windows 10 64 bit computer. It was taken out by my antvirus saying it w ......
    Reply: First, use a good antivirus software to scan all the files on your computer and remove any viruses.  …view >>>
    [2024-07-10]
    Alexey say: Hola me compre un MEdion Universal Docking Station MD42495 MSN30002543 08/04 2.0, el adaptador ......
    Reply: This is a 32-bit driver file, and your system is 64-bit. Therefore, please do not use this file. I r …view >>>
    Files List:
    ABCDEFGHIJKLMNOPQRSTUVWXYZ0123456789OtherAll Files
    If you need help, please contact support@pconlife.com through E-mail
    Copyright© 2015-2025 pconlife.com All Rights Reserved.